Hi,
I ordered my Jam 1.2 eco flex back in March - think it was March 20th... My Adam was finally built on Friday and due to be delivered on 17th May. It has been one looooong wait!The delivery date kept getting put back
.I went for the black 2 tone pack in red n roll, a black roof and black 17" alloys. It'll have red trim on the steering wheel, gear stick and handbrake.
Does anyone know how long it takes for the tracker to go from the second tick to the third?
I ordered my Jam 1.2 eco flex back in March - think it was March 20th... My Adam was finally built on Friday and due to be delivered on 17th May. It has been one looooong wait!The delivery date kept getting put back
Does anyone know how long it takes for the tracker to go from the second tick to the third?